ABOUT US

FAM Group Construction LLC is one of the branches of the “FAM Group” family. The company was officially registered on December 2, 2019, based on an extract from the state register under registration number 1912020386947900, and commenced its operations on January 7, 2020.

Since its establishment, the company has carried out a number of works in welding installation, painting, construction and installation of buildings and structures requiring permits, as well as the installation and operation of liquid and natural gas facilities.

From the start of its operations to the present day, the company has implemented the following projects:

In accordance with the service agreement concluded between the parties, the execution of works commenced on January 7, 2020. During the implementation period, welding and repair works of the dryer regeneration vessel and large-capacity tanks operating under a pressure of 12 bar were completed and delivered on January 22, 2020.

At the Ethylene-Polyethylene Plant, the following works were carried out:

In accordance with the agreement dated January 24, 2020, sandblasting and painting of pipelines were completed and delivered on February 29, 2020.

Under the second agreement dated June 22, 2020, welding and insulation works of steam turbine pipelines were performed. In accordance with the contract, insulation of metal pipes using rock wool and aluminum sheets, as well as welding and installation works of metal pipelines, were carried out and delivered on January 30, 2021.

Under the agreement dated November 1, 2020, water and air testing of the steam turbine pipeline systems was performed. This included testing of the PN16 fire line, air testing of the chimney stack, and testing of 2″, 4″, 6″, 8″, 16″, and 20″ pipeline systems. This project was completed and delivered on December 28, 2020.

In the Nar Hotel located in the Göyçay District, works were carried out for the construction of the Nar office using metal structures.

On January 28, 2021, repair and installation works of cooling radiators were performed at the Khachmaz Power Station, and the project was delivered on February 25, 2021.